From rgafner@comcast.net Fri Jun 02 15:10:22 2006
Subject:Re: Two-tier for standing up
IMHO, That pipe and clamp stuff is for permanent installations. I've
made that mistake using those materials for temporary framework,
etc.. Takes hours to construct, level and deconstruct. Plus the
weight of the pipes and the noise.
RG
I use the Ultimate Apache stand and that takes 10 to 15 minutes to
construct. It's like an A Frame. Plenty of room for my pedals. Too
long to set up/break down for quick set changes. I load up
everything and get a helper to move me on stage in one movement.
Super sturdy, it holds my heavy 6 space amp rack but any changes in
levels or uneven floor and back to the drawing board!
RG
On Jun 2, 2006, at 3:35 PM, Simon Beck wrote: